Iraq Spending
The United States paid $14 for a square meter of concrete that was estimated to cost $3.46.
The United States paid $14 for a square meter of concrete that was estimated to cost $3.46.
SIGIR
Anham, a Saudi Arabia-based contractor charged the U.S. $900 for a $7.05 control switch, a 12,666 percent price mark up.
Anham, a Saudi Arabia-based contractor charged the U.S. $900 for a $7.05 control switch, a 12,666 percent price mark up.
Reuters/Fred Prouser
Pioneer, a U.S. contractor, charged the government $80 for a PVC elbow, which is a small plumbing pipe, as compared to the competitor’s offer of $1.41 (a 5,574 percent difference).
SIGIR
In 2004, the U.S. awarded contractors $243 million to construct and equip 150 primary healthcare centers across the country. In 2007, however, SIGIR found that not even half of the facilities had been implemented, and the centers that had were poorl
In 2004, the U.S. awarded contractors $243 million to construct and equip 150 primary healthcare centers across the country. In 2007, however, SIGIR found that not even half of the facilities had been implemented, and the centers that had were poorly constructed. The slowed production, lack of oversight and poor performance by contractors added more than $100 million to the project’s pricetag. It eventually cost the U.S. $345 million tax dollars to build and equip 133 primary health care centers, short of the original request, and the centers were still in poor quality upon SIGIR’s final inspection.
Reuters/Stringer
In 2005, the U.S. government awarded 21 contracts totaling $27 million to repair the poorly constructed Mosul Dam, which was supposed to supply drinking water, irrigation, flood control and hydroelectric power to the surrounding region on the Tigris
In 2005, the U.S. government awarded 21 contracts totaling $27 million to repair the poorly constructed Mosul Dam, which was supposed to supply drinking water, irrigation, flood control and hydroelectric power to the surrounding region on the Tigris River. However, when SIGIR inspectors visited the dam two years later, they found that no one had been monitoring the project and at least $19.4 million worth of equipment and materials were not being used.
IRMO/SIGIR
The wastewater treatment plant in Nassiriya cost $277 million and is widely viewed as a failure…Probably because the project was supposed to serve 550,000 people in five surrounding cities, but was build without access to reliable and affordable elec
The wastewater treatment plant in Nassiriya cost $277 million and is widely viewed as a failure…Probably because the project was supposed to serve 550,000 people in five surrounding cities, but was build without access to reliable and affordable electric power supply. The final project, completed in 2010, ended up produce “murky water” that local residents weren’t able to use.
UN Environment Programme/SIGIR
In May 2004, the U.S. government awarded Parsons Delaware, a U.S. construction company, $80 million to build the Khan Bani Sa’ad Prison, which was supposed to add 3,600 beds to the province’s correctional capacity. In 2006, three months after the pri
In May 2004, the U.S. government awarded Parsons Delaware, a U.S. construction company, $80 million to build the Khan Bani Sa’ad Prison, which was supposed to add 3,600 beds to the province’s correctional capacity. In 2006, three months after the prison was supposed to be completed, Parsons asked for another two and a half years to complete the project. Citing “massive cost overruns, the request was rejected. Instead, the U.S. government signed new contracts to complete the work, which was suspended in 2007. The project which had already cost the U.S. $40 million was then transferred to Iraq’s Ministry of Justice despite the fact that the ministry made clear they did not plan to complete the building. In 2008, SIGIR visited the site to find it completely abandoned and completely unsecure, deeming Parson’s workmanship to be“poor-quality” and “potentially dangerous.” The site still sits dormant in Diyala and apparently will never be used.
Special Inspector General for Iraq Reconstruction
Anham, a Saudi Arabia-based contracting company, purchased the Giant Voice systems, an intercom system to install at Abu Graib and Umm Qasr warehouses, for nearly 104 percent above retail cost. The intercom system cost $90,908, not including shipping
Anham, a Saudi Arabia-based contracting company, purchased the Giant Voice systems, an intercom system to install at Abu Graib and Umm Qasr warehouses, for nearly 104 percent above retail cost. The intercom system cost $90,908, not including shipping. Compared it the manufacturer’s retail price of $44,615. They also included installation costs ranging from $20,000 to $31,550, though according the manufacturer, the system is “plug and play” and requires little effort to install. (this was later confirmed by SIGIR).
SIGIR
The project was terminated shortly after the contractor was awarded an advanced $100,000. He reportedly took the money and fled to Syria, and nothing was ever built.
The project was terminated shortly after the contractor was awarded an advanced $100,000. He reportedly took the money and fled to Syria, and nothing was ever built.
Reuters/Tim Wimborne
An Iraqi contractor was hired by the U.S. government to construct an Iraqi National Guard battalion barracks. The task order was modified six times, and increased funding to roughly $10.6 million. But the contractor was unable to make progress and SI
An Iraqi contractor was hired by the U.S. government to construct an Iraqi National Guard battalion barracks. The task order was modified six times, and increased funding to roughly $10.6 million. But the contractor was unable to make progress and SIGIR identified leaking septic tanks, latrine sinks pulling away from the wall and structural failures so the project was terminated for default in March 2007. Still, the contractor was paid the full contract amount of $10.6 million. One month later, another Iraqi company was awarded $328,000 to complete the project. It was finished seven months later.
Reuters/Damir Sagolj
Anham charged the U.S. $3,000 for a circuit breaker valued at $94.47 (a 3,076 percent markup).
Anham charged the U.S. $3,000 for a circuit breaker valued at $94.47 (a 3,076 percent markup).
Reuters/Mike Segar